Cost Guides › Pricing
A steam enclosure in San Diego runs $3,200 to $7,800 for the glass and hardware. The generator, tile, waterproofing, and electrical are separate trades. The glass is rarely the expensive part of a steam room, but it is the part that decides whether the room actually gets hot.
| Configuration | Typical Installed Price | What It Includes |
|---|---|---|
| Door and panel retrofit on an existing steam room | $2,600 - $4,800 | Replacing failed glass and seals on a room that already has a generator. |
| Semi-framed steam enclosure | $3,200 - $5,600 | Framed perimeter with sealed door. More forgiving, less expensive, more visible metal. |
| Full-height frameless with transom | $4,200 - $7,800 | Glass to the ceiling, venting transom above the door, drop-down sweep, sealed jamb. |
| Seal and sweep rebuild | $220 - $480 | The cheap fix when the glass is fine but the steam escapes. Usually the real problem. |
| Curved steam enclosure | $5,400 - $9,200 | Bent glass to the ceiling. Custom fabrication on every panel. |
| Item | Added Cost | Why |
|---|---|---|
| Transom and venting hardware | +$350 to +$800 | A steam room needs to vent when you are done or it grows mold. The transom is the mechanism. |
| Drop-down sweep and magnetic seal | +$180 to +$450 | The two parts that actually hold steam at the door. |
| Ceiling height over 96 inches | +$300 to +$700 | Taller glass needs thicker panels and heavier hardware. |
| Low-iron glass | +$250 to +$600 | Steam rooms are usually bright. Green edges are obvious. |
| Ceiling slope correction | +$250 to +$600 | Condensate has to run away from the door. If the ceiling is flat or sloped the wrong way, that gets fixed first. |
Ranges reflect actual San Diego County installs. Your quote is firm and in writing after templating.
Steam escapes at the top and the room never gets hot. Full-height glass with a transom is not optional.
The hinge edge is the usual leak. A sealed jamb detail is the difference between a steam room and a warm shower.
A sealed box holds moisture after use. A timer on the exhaust fan is not a luxury, it is what stops the room from growing mold between sessions.
Steam produces condensate faster than a standard shower drain expects. We flag it if the drain looks undersized.
Site review and quote within a few days. Template after tile and waterproofing are finished and cured. Fabrication is 12 to 20 business days for a sealed full-height unit. Install is a full day, and we run the generator to find leaks before calling it done.
Sometimes. It depends on ceiling height, whether the walls can be sealed, the drain size, and where the generator sits. A retrofit is usually more invasive than people expect because the waterproofing has to be right.
No. Our scope is glass, hardware, and sealing. The generator, electrical, tile, and waterproofing are separate trades, and we say so in writing so there is no confusion later.
Almost always because the enclosure leaks steam at the top or the hinge side. A standard shower enclosure with a glass panel to 78 inches will not hold steam no matter how big the generator is.
Yes. Steam plus hard water is the harshest combination for glass. We recommend a factory coating on every steam panel, and a squeegee routine after each session.
Serving San Diego and all of San Diego County. Templated on site, quoted in writing.
Free — no obligations